Case Studies

Projects over 1m USD shared & Full rerence List upon Request

Project with Partner PMT, Canada
Installation of ClassiTEQ 3rd gen. Separator
Example: Reference plant Canada 2023
- Ø 4,12 x 12,8m ball mill, 4000 HP installed power
- 175 000 m³/h separator air volume - ClassiTEQ-DC/S 175

- Scope of supply: Separator, Fan, Bag filter, Conveyingequipment
- Main task: to find a equipment layout, fitting in theexisting building, production and finesse increase, cementtemp.
Project with Partner PMT, Costa Rica
Meal By Pass installation with PMT in Costa Rica
Project with Vidmar, USA
Complete Implementation of Vimdar's TRS.Net system to manage manage the truck flow inside the plant.
Project with Partner Bedschi, Peru
Engineering, manufacturing and delivery of one conveyor (width 1.000mm and total length of 710m) and one stacker STK33/1000 designed for a nominal stacking rate of 1.500tph of iron ore
Project with Partner Bedeschi, Puerto Rico
Replacement of main crusher parts and peripheric installation at raw material handling plant with technology partner Bedeschi, Italy.
LOAD MORE
NUMBERS SPEAK
20+
Engaging in over 20+ countries across the American continent
250+
Over 250+ projects completed
25+
Over 25 years of experience in the cement industry

Never miss out the latest news

Get news and updates from CemTeCon and our webinars straight to your inbox.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.